Plumbing In A Bath – How To Proceed

by Eugene file under General

To avoid too long a disruption of the domestic hot and cold water supplies you can fit the taps, waste and trap into the new bath before removing the old one.

Slip a flat plastic washer over the tail of each tap and insert the tails through the holes provided for them. A mixer usually has one large flat washer or gasket with two holes — one for each tap tail. Beneath the rim of the bath, slip ‘top hat’ or ‘spacer’ washers over the tails to accommodate the protruding shanks of the taps. Screw on the back-nuts and tighten them. Bed the waste flange onto plumber’s putty or non-setting mastic, secure the back-nut and connect up the trap. Then connect up the overflow pipe.

Plumbing In A Bath Removing the old bath may well be the most difficult part of the procedure. Turn off the hot and cold water supplies and drain the distribution pipes from the bath taps. If you haven’t done so already, remove the bath panel to give access to the plumbing at the foot of the bath. You can try to unscrew the back-nuts holding the taps in position, but it’s generally easier to undo the nuts that connect the distribution pipes to the tails of the taps. In order to reach the one nearest the wall you may have to dismantle the overflow, either by unscrewing it or, if it is taken through the wall, by cutting it off flush with the wall. Then undo the waste connection. The bath is now disconnected from the water supply pipes and from the branch waste pipe and can be pulled away from the wall. Unless you particularly want to save the old bath and have some strong helpers, do not attempt to remove it from the room or the house in one piece. It is very heavy. The best course of action is to break it into manageable pieces. Drape an old blanket over it to prevent flying chips of enamel and wear goggles to protect the eyes. Then, with a club hammer, break the bath up into pieces that you can easily carry away. Place the new plastic bath in position and assemble the cradle or other support exactly as recommended by the manufacturer. It is most unlikely that the tails of the new taps will coincide with the position of the tap connectors of the old distribution pipes. If they don’t, the easiest way of making the connections is by means of bendable copper pipe. This is corrugated copper tubing — easily bent by hand. It is obtainable in 15mm and 22mm sizes and either with two plain ends for connection to soldered capillary or compression joints, or with one plain end and a swivel tap connector at the other. For this particular job two lengths of 22mm corrugated copper pipe will be required, each with one end plain and one end fitted with a swivel tap connector. Offer the corrugated pipe lengths up to the tap tails and cut back the distribution pipes to the length required for connection to the plain ends. Leave these pipes slightly too long rather than too short. The corrugated pipe can be bent to accommodate a little extra length. Now connect the plain ends to the cut distribution pipes using either soldered capillary or Type ‘A’ compression couplings. The chances are that the distribution pipes will be 3/4jfl imperial size. If you use compression fittings an adaptor— probably simply a larger olive — will be needed for connection to a 22mm coupling. If you use soldered capillary fittings, special 3/4in to 22mm couplings must be used. Remember to keep the blowtorch flame well away from the plastic of the bath. Connect up the swivel tap connectors of the corrugated pipe and the overflow of the bath. Do this in a logical order. First connect the tap connector to the further tap. A fiber washer inside the nut of the tap connector will ensure a watertight joint. Then connect up the flexible overflow pipe of the combined waste and-overflow fitting to the bath’s overflow outlet. Finally connect the nearer tap to the nearer tap connector. If you have installed new pipework then you can install the entire trap, waste and water supply pipe spurs before moving the bath into position. Whatever you have decided upon, finish making all the connections, then reinstate the water supply and check for leaks.

The level of the positioned bath should now be checked using a spirit level, and adjustments made (you’ll need a spanner to set the adjustable feet). When all is level, fit the side and end panels in position and the job is finished.